|
The
leather surface is to be coated with Dendrite OP Leather
Primer on the areas where adhesive is to be applied
subsequently, for bonding. After coating, substrate
is to be kept open for approx. 30 minutes for solvent
evaporation and surface preparation for subsequent adhesive
application as well. Second coat of primer may be applied
in case of much oily surface for better result.
The
treated leather then to be taken for adhesive application
as well for further processing.
|