Call us on
91 - 98746 20044
Cut the pipe straight. The bonding area of the pipe and socket has to be cleaned and burrs removed. Ensure dry and tight fit of the joints. The pipe should easily go 1/3 of the way into the socket before cementing. A uniform coat of DENDRITE UPVC Solvent Cement has to be applied on the joining section of the pipe and socket using a proper applicator. Insert the pipe into the socket immediately and rotate the pipe 45°- 90° while assembling. Ensure even distribution of solvent cement within the joint and wipe out excess cement. Properly align and hold the assembly for 10 - 20 seconds. Allow 15 minutes handling strength and curing time of 2 hrs before putting to use. Ideal application temperature is 0°C - 50° C. Close the cap after every use.
Store in a cool, dry place. Highly inflammable. Keep away from naked flame. Avoid using fingers for application.
20, 50, 100, 200 ml